Runbook — commands only

Budget resets on a fixed day each month (set BUDGET_ROLLOVER_DAY in config/budget.env, e.g. 17). Usage comes from CSV (dashboard → export).


How the two flows work together

projects.md plans/YYYY-MM.md (monthly plan)
What Allocation: target % per project (e.g. course-builder 25%, datadog 15%). This period’s plan: wishlist (tasks A, B, C) + planned features per repo.
When Set once or when rebalancing. One file per period; copy from template when starting a new period.
Scripts estimate-budget.sh (Est. $ per project), what-if-target.sh (try a new %). estimate-plan.sh (does wishlist total fit in remaining $?).
Link Est. $ per project from here feed into the monthly plan’s “Planned features per repo” table — each repo’s features should sum to ≤ that repo’s Est. $. Wishlist is a flat list of tasks; “Planned features per repo” splits by project using Est. $ from projects.md / estimate-budget.sh.

In practice: Set target % in projects.md → run estimate-budget.sh to get Est. $ per project → in plans/YYYY-MM.md fill the wishlist (run estimate-plan.sh to check total fits remaining) and fill “Planned features per repo” (keep each repo’s sum ≤ its Est. $ from the table).


1. Load current usage (do this first)

Export CSV from dashboard, then:

./scripts/import-usage-from-csv.sh path/to/export.csv

Or pipe/paste raw CSV:

cat export.csv | ./scripts/import-usage-from-csv.sh

2. See used / remaining $

./scripts/usage-remaining.sh

3. Plan the period (wishlist → fits?)

Where the template fits: Your working plan is plans/YYYY-MM.md (e.g. plans/2026-02.md). If you don’t have one yet, create it by copying templates/monthly-plan-template.md into plans/YYYY-MM.md. That file is what you edit and what estimate-plan.sh reads.

Edit the wishlist table in plans/YYYY-MM.md, then:

./scripts/estimate-plan.sh
# or: ./scripts/estimate-plan.sh plans/2026-02.md

Adjust wishlist until total fits remaining; copy into week-by-week.


4. Per-project estimates (from projects.md target %)

Table of Est. $ per project:

./scripts/estimate-budget.sh

What-if for one repo (e.g. give course-builder 25%):

./scripts/what-if-target.sh course-builder 25

5. Optional — refresh Embabel low-effort list

./scripts/update-embabel-low-effort-issues.sh

Pick from embabel-low-effort-issues.md when you have remaining $.


Config (one-time or rare)

  • config/budget.envMONTHLY_BUDGET_DOLLARS=400, BUDGET_ROLLOVER_DAY (e.g. 17 = resets on the 17th), DOLLARS_PER_FEATURE=20, DOLLARS_PER_SESSION=10
  • config/usage.env — set by import script (USED_DOLLARS)
  • projects.md — target % per project
  • plans/YYYY-MM.md — your plan for the period; copy from templates/monthly-plan-template.md when starting a new period